Friday, November 13, 2009

Introducing Takt Time, Cycle Time and Lead Time

Takt Time
Based on the German word that indicates pace, the rate or pace of production as matched to the pace of customer sales. Used in lean manufacturing to align production time in linked manufacturing processes. Takt time represents the customer demand rate and is used to synchronize the rate of production with the rate of sales.
Numerically it is the daily production number required to meet orders in hand divided into the number of working hours in the day. For example, if customers demand 240 pcs per day and the factory operates 480 minutes per day, Takt Time is two minutes (480/240).
There are 2 type of Takt Time : Part and Line. The explanation above belong to Part Takt Time.
Whereas Line Takt Time is average rate of a line to produce a piece of part in working hours in the day. For example, if a line produces two type of parts, part A 200 pcs per day and part B 120 pcs per day and the Line operates 480 minutes per day, Line Takt Time is 1.5 minutes, comes from 480 divided by 320 (200+120).

Cycle Time
In short term, the time that elapses from the beginning to the end of a process to make a piece of part. In other definition, Cycle time is the total time from the beginning to the end of your process, as defined by you and your customer. Cycle time includes process (machine) time, manual work, walk, during which a unit is acted upon to bring it closer to an output, and delay time, during which a unit of work is spent waiting to take the next action.

Lead Time
The total time needed for an order to be processed and delivered. There are 4 kinds 0f Lead time: Information, Conveyance, Process and Store.
  1. Information Lead time is the total of time of information movements, start from order from customer to production order.

  2. Conveyance Lead time is the total of time of part movements, start from raw material, process to arrival at customer warehouse.

  3. Process Lead time is the total of part processes

  4. Store Lead time is the total of time of part stagnation in all stations such as WIP store, Finished Goods store, etc

Friday, October 23, 2009

Objectives to reach the Toyota Production System

The Toyota Production System establishes several points to cause that the objectives of the four previous concepts are reached and that they are the base of the Toyota Production System.
  1. KANBAN System is an information system that controls the production of necessary articles in the necessary amounts, the necessary time, each process of the company and also of the companies’ suppliers. It establishes a production system in which the products are hauled by the following station; the products cannot be pushed by the first station. The products are hauled to the rate those are needed (called PULL System). The last station is the one that marks the rate of production.
  2. Constant production, that means that the line of production no longer this jeopardizes to manufacture a single type of product in great lots. However, the line produces a great variety of products every day in response to the variation of the demand of the client. The production is obtained adapting the changes of the demand daily and monthly.
  3. Reduction of the Set-up time (S.M.E.D.). The Set-up time is the amount of necessary time in changing a device of an equipment and preparing that equipment to produce a different model, but to produce it with the quality required by the client and without incurring costs it company and to obtain with this, to reduce the time of production in all the process. The product that arrives first the market enjoys a high percentage of gains associated with the initial introduction of the product.
  4. Standardization of operations: One is to diminish the number of workers, balancing the operations in the line. Assuring that each operation requires of the same time to produce a unit. The worker has a routine of standard operation and maintains an inventory in constant in process.
  5. Multifunctional distribution of machines and workers, who allow to have a force of very flexible work, which must of or being trained and to have a great versatility that is obtained continuously through the rotation of the work and they evaluate and they review the standards and routines of operation, and the machines could be placed in distributions in the form of “or” where the responsibility of each worker will be increased or diminished following the work to realize in each product.
  6. Improvement of activities, which are focused to reduce costs, to improve productivity, to reduce the work force, to improve the moral of the employees and this improvement carries out through work parties and system of suggestions.
  7. Visual control systems that monitor the state of the line and the flow of the production, with very simple systems, for example, some lights of different colors that indicate some abnormalities in the line of production. Some other visual controls like leaves of operations, digital cards of KANBAN, displays, etc.
  8. Quality control in all the company, that promotes improvements in all the departments, by means of the action of a department and reinforced by other departments of the same company. Having special attention in the meeting of directors to provide that the communications and cooperation in all the company.